Water production shut off
Objective: This gas production well with 4 ½" x 5 ½" tubing was completed in 1996. The programme's primary objective was to shut off water production zones and install a new completion. HWO was used to remove the straddle completion, isolate the Rotliegend formation, isolate the water zone in the Bunter formation and recomplete the well as a Bunter producer, with production only from the top part of this zone.
Location: The well side is located in an environmentally-sensitive area that borders a UNESCO protected dune area and within close proximity to housing. The use of the HWO unit will have a major impact on how operations affect the local environment:
- Significant reduction in site preparation work compared to a drilling rig and no requirements to extend the concrete base
- Significant reduction in trucking operations to rig up and rig down the HWO unit compared to a normal drilling unit
- Reduced visibility of the HWO unit (no derrick structure)
- Lower noise level than a normal drilling unit
Execution:
- Work completed without incidents (no spills, no accidents)
- Successful abandonment of the Rotliegend formation
- Completion recovery and packer milling successfully carried out
- Compliments from nearby residents on minimal disturbance
- Well is producing twice the expected capacity (dry gas)